70 MILLION LITRE FUEL LOGISTICS FACILITY

Submitted by on Mon, 04/14/2025 - 23:38

Lake Victoria Logistics (LVL) located in Bukasa-Bwerenga, Kawuku was officially launched in July 2024 by H.E the President of the Republic of Uganda. It was funded by three stakeholders; Marathi Infra Services, Digimon Group, and Africa Finance Corporation.

The facility has 14 tanks with a collective capacity of 70 million litres. It has 256-meter-long jetty which facilitates the berthing of vessels, enabling effective cargo handling. The project also includes a two tanker ships each with cargo capacity of 4.5 million litres.

The project is expected to reduce transportation costs by 50% and reduce pollution from trucks by 90,000 tons of CO2 for each trip the barge makes.

https://statehouse.go.ug/transforming-ugandas-transport-system-president-museveni-launches-lake-victoria-logistics-facility/